Deconstruction and rehab begin
slabs cut, massive footings to be poured for heavy walls
a new roof installed
all audio cables run in steel conduit to minimize noise
all studio rooms built from double masonry block walls
packing all double walls with dried sand
7” concrete floors floated on neoprene pucks
all studio rooms have a 4” concrete ceiling
control room A/C ducting and spring isolated inner shell
massive steel beams to support concrete ceilings
all studio rooms have isolated inner ceilings
control room inner shell soundproofing
custom wall panels and fabric done on site
Equitech balanced power for all audio circuits
welding the outside awnings, installing double insulated glass
 
Below is just a peek at the massive undertaking of rehabing an old building and transforming it into
a state of the art recording facility. Total build out took more than a year.
We offer acoustical and studio consulting for all types of applications, from home project studios to
multi-room facilities.